摘要
为提高我军大规模登陆作战无码头卸载保障能力,通过分析诺曼底登陆人工港的建设背景、构成和作用,指出人工港是大规模登陆作战的关键条件,必须大力发展人工港无码头卸载装备体系,做好人工港建设计划的水文气象保障,注重平时无码头卸载装备的训练和管理等方面的工作.
In order to improve our army’s unloading capability without wharf in large-scale landing operations,the paper firstly analyzes the construction background,composition and function of Normandy landing artificial port.Then,it points out that artificial port is the key condition of large-scale landing operations,and we should vigorously develop unloading equipment system without wharf for artificial port,do well in the hydrological and meteorological support of artificial port construction plan,and pay attention to the training and management of unloading equipment without wharf in peacetime.
作者
罗雷
王广东
赵哲明
韩亮
LUO Lei;WANG Guangdong;ZHAO Zheming;HAN Liang(Union Projection Department,Army Military Transportation University,Tianjin 300161,China;Institute of Military Transportation,Army Military Transportation University,Tianjin 300161,China;Transport and Delivery,Joint Logistics Support Force,Wuhan 430000,China)
出处
《军事交通学院学报》
2020年第1期15-18,共4页
Journal of Military Transportation University
关键词
诺曼底登陆
无码头卸载
人工港建设
Normandy Landing
unloading without wharf
construction of artificial port