跨海大桥箱梁预制场出海口设计及施工技术

Marine Outfall Design and Construction Technology for Prefabricated Box Girder of Cross-sea Bridge
下载PDF
导出
摘要 随着箱梁预制数量的增多,出海口施工关系到跨海大桥箱梁架设施工能否顺利进行.出海口设计的总体思路为'引进来',即在陆地上开凿装船区,避免'伸出去'进行大量海上作业.主要考虑因素一是确保任何时候运输船不能搁浅,航道在高潮位时进出船只;二是水中龙门吊基础根据实测海况利用低潮位时进行混凝土基础作业,最大程度地避免水中作业.本文结合日常出海口施工经验及控制要求,对出海口设计及施工要点及难点作出探讨. With an increasing number of prefabricated box girder,the construction of marine outfall relates to whether the box girder erection of suspension bridge can be carried out smoothly.The general idea on designing the marine outfall is'bring in',which means to dig the loading area on the land,thus avoiding'stretching out'to carry out a large number of operations on the sea.The main factors are as follows:firstly,we need to ensure that the transporter can not strand at any time,vessels can only pass at high tide.Secondly,we need to make use of the low tide while performing concrete work in the underwater gantry crane foundation,which is to minimize operating in the sea.Combined with the construction experience and control requirements of the marine outfall,this paper tries to focus on the key points and difficulties in marine outfall design as well as construction.
作者 陈伯军 Chen Bojun(China Railway 19th Bureau Group 5th Engineering Co.Ltd.,Dalian Liaoning 116000,China)
出处 《铁道建筑技术》 2018年第A02期68-70,114,共4页 Railway Construction Technology
关键词 出海口 控制爆破 质量控制 marine outfall control blasting quality control
  • 相关文献

参考文献7

二级参考文献26

共引文献80

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部