梨花顶隧道平面独立控制网的建立及贯通误差预计 被引量:1

Establishment for Independent Horizontal Control Network of Lihuading Tunnel and Estimate of Penetration Error
下载PDF
导出
摘要 以梨花顶长大隧道工程为例,介绍了GPS平面独立控制网的建立方法,采用固定一点一方位平差的方法来提高控制网精度,从而实现隧道贯通测量方案优化与误差预计,确保长大隧道准确贯通,同时为类似的理论研究和工程实践提供借鉴和参考. Taking the construction of Lihuading long tunnel as an example,this article introduced how to establish the GPS independent horizontal control network with the method of fixing one point and one azimuth angle adjustment to improve the accuracy of control network.This method could optimize the measurement plan and expect the error successfully,thus the success penetration of the tunnel is ensured.Meanwhile,it could provide reference for similar theoretical research and engineering practice in the future.
作者 胡继威 Hu Jiwei(China Railway 19th Bureau Group 1th Engineering Co.Ltd.,Liaoyang Liaoning 1 1 1000,China)
出处 《铁道建筑技术》 2018年第A01期142-145,共4页 Railway Construction Technology
基金 中铁十九局集团有限公司科技研究开发计划项目(15-17B).
关键词 长大隧道 GPS平面独立控制网 贯通误差 long tunnel GPS independent hofizontM control network error of penetration
  • 相关文献

参考文献11

二级参考文献43

共引文献64

同被引文献11

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部