摘要
为确保地铁暗挖隧道下穿京哈铁路和既有轻轨轨道的施工安全,控制既有运营轨道的沉降与隆起,掘进前用超前水平加固技术对地层加固止水,根据监测数据实时调整注浆各相关技术指标,安全顺利地完成暗挖隧道下穿铁道施工任务.
To ensure the construction safety of the subway tunnel crossing underneath the Beijing—Harbin Railway and the existing light railway,an advanced horizontal reinforcement technology of ground was introduced to reduce the settlement and uplift of existing operational rail.According to the real—time monitoring data,grouting was in time performed in accordance with corresponding standard,as a result,the mined·excavation construction of subway tunnel crossing underneath existing railways was completed successfully.
作者
李志锋
Li Zhifeng(China Railway 16th Bureau Group Metro Engineering Co.Ltd.,Beijing 100124,China)
出处
《铁道建筑技术》
2018年第A01期140-141,185,共3页
Railway Construction Technology
关键词
隧道暗挖
地层液化
水平注浆
封端
mined—excavation of tunnel
formation liquefaction
horizontal grouting
sealing end