期刊文献+

现浇箱梁组合支架整体横移施工技术研究

Construction Technology Study on Overall Transverse Movement of Composite Bracket for Cast-in-place Box Girder
下载PDF
导出
摘要 以新建上海至南通铁路站前二标段张家港高架站特大桥现浇箱梁施工为工程背景,针对多孔简支箱梁支架现浇的特点,从技术可行性和经济合理性角度出发,分析确定组合支架的布置方式,采用midas软件对组合支架进行了受力计算,研究制定组合支架整体横移的移运系统.这可为今后类似工程施工提供参考. Taking the cast—in—place box girder construction of Zhan舀iagang elevated station special bridge in the first two bids of newly—built Shanghai-Nantong railway station as the background.and according to the characteristics of cast-in-situ bracket for the multi—hole simply—supported box girder,the paper determined the arrangement of the combined bracket from the perspective of technical feasibility and economic rationality,and calculated the force of composite bracket by using Midas software.Moreover,the paper studied and formulated the transporting system for moving transversely the composite bracket as a whole.It could provide a reference for the construction of similar projects in future.
作者 陈薇 Chen Wei(China Railway 19th Bureau Group Second Engineering Co.Ltd.,Liaoyang Liaoning 111000,China)
出处 《铁道建筑技术》 2018年第A01期73-75,90,共4页 Railway Construction Technology
关键词 现浇箱梁 组合支架 整体横移 移运系统 cast-in-situ box girder composite scaffold overall transversely moving transporting system
  • 相关文献

参考文献8

二级参考文献34

共引文献85

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部