摘要
对于排洪渠中水流来说,阶梯式消能工能够通过旋滚消能和沿程掺气的方式有效消除水流动能,降低下游水流的余能,因此能够简化消力池规模,文中通过水工模型试验,对于排洪渠中的阶梯式消能工消能情况进行了分析,并对模型试验中发现的问题提出了建议.
For the water flow in the flood drainage canal,the stepped energy dissipator can effectively eliminate the water flow energy by rolling off the energy and adding gas along the road,and thus can simplify the size of the stilling p001.By the hydraulic model test,the energy dissipation of the stepped energy dissipator efficiency in the flood drainage canal is analyzed,and the suggestions were put forward about the problems in the model test.
出处
《山西水利科技》
2019年第2期48-50,共3页
Shanxi Hydrotechnics
关键词
阶梯式消能工
排洪渠道
模型试验
stepped energy dissipator
flood drainage canal
hydraulic model test