2Marie-Anne LAFITTAU,Guillaume PELTON,Frederic GORGETTE,et al.New options for connecting generation on distribution networks and required network control preparation[C]//CIRED,Lyon,France,2015.
3Alberto PAGNETTI,Josselin FOURNEL,Christophe SANTANDER,et al.A comparison of different curtailment strategies for distributed generation[C]//CIRED,Lyon,France,2015.
4Aurel GARRY,Florent CADOUX,Marie-Cecile ALVAREZ,et al.Curtailment of distribution-side power generation for primary substation investment deferral[C]//CIRED,Lyon,France,2015.
5Manuel CASTRO,Richard POTTER,Daniel HOLLINGWORTH,et al.Assessing the contribution of demand side response to network security[C]//CIRED,Lyon,France,2015.
6Guilherme ROLIM,Arlan BETTIOL,Rafael HOMMA.Smart grid deployment planning:Case study covering a Brazilian feeder in automation process[C]//CIRED,Lyon,France,2015.
7Stefan BOCKER,Christian WIETFELD,Frederik GETH,et al.Choice of ICT infrastructures and technologies in smart grid planning[C]//CIRED,Lyon,France,2015.
8Danny PUDJIANTO,Goran STRBAC,Sotiris GEORGIOPOULOS,et al.Strategic investment model for future distribution network planning[C]//CIRED,Lyon,France,2015.
9S.Georgiopoulos,C.Marantes,D.Openshaw.Flexible plug and play low carbon networks enabling the integration of renewable energy[C]//CIRED,Lisbon,Portugal,2012.
10Jeremy BOUBERT,Solene BOYARD,Francois DISPOT.An investment versus flexibilities comparison framework[C]//CIRED,Lyon,France,2015.