摘要 配电网规划期间,为了进一步提升电网可靠性,减少用户端缺电成本,需要供电部门不断提升可靠性投资成本,但是在盲目追求供电可靠性期间,一定会使得可靠性投资方面的成本不断增加.为了寻求可靠性供电稳定性,本文综合考虑分析了可靠性成本与缺电成本,希望能对当前配电网规划带来一定帮助. During the planning of distribution network,in order to further improve the reliability of the power grid and reduce the shortage of power at the customer end,the power supply department needs to continuously improve the reliability and investment cost.However,during the blind pursuit of power supply reliability,it will definitely make the reliability investment.The cost is constantly increasing.In order to seek reliability and power supply stability,the article comprehensively considers the reliability cost and the power shortage cost,and hopes to bring some help to the current distribution network planning.
作者 赵鑫 Zhao Xin
出处 《电力系统装备》 2019年第16期46-47,共2页 Electric Power System Equipment
关键词 可靠性成本 缺电成本 电网规划 reliability cost power shortage cost power grid planning
  • 相关文献

参考文献2

二级参考文献17

共引文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部