摘要 近些年来,随着我国经济水平的不断提升,电力需求量逐渐曾大,当前在电力系统中,省地协同负荷批量切除控制系统是极其关键的控制系统,当某一区域内的电网出现重大故障导致功率缺额现象时,需要利用省级的调度以及控制系统实现系统的联动,对大负荷进行切断,实现电网功率的稳固,从而有效地保障电网的稳定运行,这也是目前比较常用而且有效的手段. In recent years,with the continuous improvement of China’s economic level,China’s demand for electricity has gradually expanded.In the power system,the province’s coordinated load batch removal control system is an extremely critical control system.When there is a power shortage caused by a major fault in the internal power grid,it is necessary to use the provincial-level dispatching and control system to realize the linkage of the system,cut off the large load,and stabilize the power of the power grid,thereby effectively ensuring the stable operation of the power grid.This is also a relatively common and effective means at present.
作者 胡馨 张亚杰 张国武 李娟娟 刘志洪 Hu Xin;Zhang Ya-jie;Zhang Guo-wu;Li Juan-juan;Liu Zhi-hong
出处 《电力系统装备》 2019年第16期27-28,共2页 Electric Power System Equipment
关键词 电力系统 省地协同 负荷批量切除 控制系统 power system provincial and local coordination load batch removal control system
  • 相关文献

参考文献1

二级参考文献12

共引文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部