摘要
某水泥厂生料均化库桩基工程施工中,通过施工勘察顺利地解决了岩溶发育区冲孔灌注桩施工中持力层选择、全断面入岩判断、溶洞处理及桩基施工顺序等一系列问题。措施行之有效,工程质量良好。
During the foundation pile construction for raw meal homogenizing silo of a cement plant,a series of issues,such as option of bearing layer for cast-in-place piles in the karst-developed area,judgment of gross section probing into rock,karst cave treatment and sequence of foundation pile construction,were solved smoothly through construction reconnaissance.Measures are proved effective and engineering quality good.
出处
《安徽地质》
2007年第2期140-142,共3页
Geology of Anhui
关键词
岩溶
施工勘察
冲孔灌注桩
Karst
construction reconnaissance
cast-in-place piles