本文从工程建设各个阶段论述如何加强工程造价管理,以求工程造价的合理、准确,继而保证项目管理目标的实现。
Through all the different phases of engineering construction,the aurhor discusses how to tighten up the engineering cost management in order to achieve the accuracy and rationality of engineering cost. Then based on this, ensure the realization of project management s target
出处
《福建建筑》
2005年第2期117-118,共2页
Fujian Architecture & Construction
关键词
工程
造价
管理
Engineering Cost Management