摘要
点式玻璃幕墙已越来越广泛应用于各种大型建筑外墙上,本文介绍福州置地广场高度23m的弧形点式玻璃幕墙安装和双曲面干挂石幕墙的施工安装技术及几项新工艺,同时提出其质量控制要点。
Spot connecting glass curtain wall is applied commonly i n various great buildings. The construction setting techniques of spot connecting arc glass cu r tain wall and dry hanging hyperboloid stone curtain wall of Fuzhou Zhidi Plaza a re introduced in this paper. At the same time, the main points of quality contr o l are presented here.
出处
《福建建筑》
2005年第4期59-61,共3页
Fujian Architecture & Construction
关键词
点式玻璃幕墙
双曲面放线
化学锚栓
施工工艺
质量控制
spot connecting glass curtain wall
hyperboloid setting out
chemical stay bolt
construction technique
quality control