分析高井热电厂对机组控制系统进行DCS改造的原因,提出改造的方案,并介绍改造的过程。最后,还总结了改造的效果和经验。
This paper analyses the cause of the DCS transformation of the control system of the units in Gaojing Cogeneration Power plant,and introduces the process of the transformation.Several plans to transform are put forward,and the results and experiences of the transformation are summarized.