摘要 提出将自动发电控制(AutomaticGenerationControl,AGC)与安全约束调度结合在一起,构成闭环控制系统,实现稳定断面越限的预防和校正控制。当稳定断面重载时,根据该断面有功功率相对于机组有功出力的灵敏度系数对机组出力的调节方向加以限制,防止由于AGC的正常调节导致重载程度的进一步加剧(简称预防控制);当稳定断面越限时,由安全约束调度提供校正控制策略,并在AGC控制下执行,自动完成解除越限的调节(简称校正控制)。在江苏省调EMS中的实际工程应用表明,该方法可以有效地将稳定断面有功功率控制在允许范围内,保证电力系统的安全稳定运行。 The authors propose that by integrating the automatic generation control (AGC) with security constrained dispatch (SCD) to constitute a closed-loop control system to implement the preventive and remedial control of tie line overload. When tie line is heavily loaded, according to the sensitivity coefficient of active power of tie line to active output of generating sets the adjusting directions of the units output are restricted to prevent the further aggravation of heavy load of tie line that is caused by n...
出处 《电网技术》 EI CSCD 北大核心 2005年第19期85-89,共5页 Power System Technology
关键词 自动发电控制 安全约束调度 预防控制 校正控制 电力系统 Automatic generation control (AGC) Security constrained dispatch Preventive control Remedial control Power system
  • 相关文献

参考文献6

二级参考文献13

共引文献197

同被引文献408

引证文献42

二级引证文献488

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部