期刊文献+

2003年以来国家电网公司直流输电系统运行情况总结 被引量:51

Summary on Operation of SGCC’s HVDC Projects since 2003
下载PDF
导出
摘要 分析了国家电网公司所属直流输电系统2003年以来的运行可靠性指标,包括相关直流输电系统的能量可用率、能量利用率、强迫和计划停运次数、时间等,以及强迫停运的原因和处理情况,说明了国家电网公司直流输电系统在夏季高峰负荷期间持续满负荷运行的重要性,阐明了进一步提高直流输电系统运行可靠性的意义。 The operation reliability indices of HVDC projects which belong to State Grid Corp. of China (SGCC) since 2003 are analyzed. The data of energy availability percent, energy utilization percent, forced and scheduled outage frequency and duration of related HVDC projects, and the reasons causing the forced outages and their processing are given. The importance of keeping SGCC’s HVDC projects operating at rated power level during summer peak load period is explained, and the significance of further improving t...
作者 喻新强
出处 《电网技术》 EI CSCD 北大核心 2005年第20期45-50,共6页 Power System Technology
关键词 电力系统 高压直流输电 运行可靠性 能量可用率 能量利用率 Power system HVDC power transmission Operation reliability Energy availability percent Energy utilization percent
  • 相关文献

参考文献1

  • 1[6]中国电力企业联合会.2003年电力可靠性指标发布--电力可靠性趋势分析报告[Z].北京:中国电力企业联合会,2004.

同被引文献418

引证文献51

二级引证文献739

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部