摘要
结合工程概况,介绍了顶升法纠倾设计过程,根据工程特点,确定了采用锚杆静压桩作为地基加固方案,并对纠倾处理施工过程进行了阐述,以使该楼顺利纠偏至设计控制位置,从而使其恢复正常使用。
Combined with the general situation of the project,it introduces the procedure of redressing slant by top lifting.According to the features of the project,it assures the plan of enforcing by anchor press pile,elaborates the procedure of redressing slant by top lifting,so as to successfully rectify the windage position in order to get back to the normal use.
出处
《山西建筑》
2007年第7期146-148,共3页
Shanxi Architecture
关键词
顶升法
锚杆静压桩
顶升量
纠倾方案
top lifting
anchor press pile
top lifting amount
plan of redressing slant