摘要
结合工程实例,对模板方案进行了分析比选,最终确定采用定型、异型模板组合拼装为该工程最终的施工方案,并对模板的设计原理及构造、空心墩的施工过程控制、施工过程中的一些技术细节等问题进行了阐述,为以后类似工程的施工提供了参考。
Combined with practical engineering,the author analyzes and compares formwork schemes,confirms composite assembly of standardized and abnormal formwork as the final construction scheme of this engineering,and illustrates design principle and conformation of formwork,control of hollow pier construction process and several technical details in the construction process,which to offer a reference for similar engineering construction.
出处
《山西建筑》
2007年第8期307-309,共3页
Shanxi Architecture
关键词
空心高墩
异型模板
施工方案
钢筋
hollow high pier
abnormal formwork
construction scheme
reinforcing steel bar