长螺旋CFG桩施工质量缺陷及改进措施实例 被引量:4

Construction quality defect and improved measures case on long auger CFG pile
下载PDF
导出
摘要 通过邯郸市某大厦CFG桩试验桩的施工及检测过程,介绍了该工程CFG桩试验桩缺陷形成的原因、对单桩承载力的影响程度及施工工艺的改进方案,载荷试验表明,施工工艺改进后单桩承载力得到了大幅度的提高,也能有效地解决CFG桩在施工过程中出现的施工质量问题。 Through the constructing and detecting process of CFG testing pile in the building of Handan,this paper introduces the reasons of generating construction quality defect,the influence on the bearing capacity of single pile and the technical project improved,and shows the bearing capacity of single pile is improved greatly afterward measures improved.This case indicates construction quality defect can be effectively settled by upgrading construction technology considering engineering geological property.
出处 《山西建筑》 2007年第8期117-118,共2页 Shanxi Architecture
关键词 CFG桩 质量缺陷 施工工艺 CFG pile quality defect construction technology
  • 相关文献

参考文献2

二级参考文献1

  • 1闫明礼 张东刚.CFG桩复合地基技术及工程实践[M].北京:中国水利水电出版社,2001..

共引文献13

同被引文献7

  • 1铁建设[2005]160号,客运专线铁路路基工程施工质量验收暂行标准[S].
  • 2铁道第四勘察设计院.软土地基试验研究文集[M].北京:中国地质大学出版社,2001.
  • 3杜永昌,王晓州,辛维克,等.高速与客运专线铁路施工工艺手册[M].北京:科学技术文献出版社,2002.
  • 4史存林 张千里 韩自力.铁路客运专线路基主要技术标准与施工关键技术.铁路客运专线施工技术,2005,(6):5-6.
  • 5GB50202-2002.建筑地基基础工程施工质量验收规范[S].[S].,..
  • 6任月静,王雪峰.浅谈砼施工的质量控制[J].民营科技,2010(2):188-188. 被引量:6
  • 7张明轩,高全臣.清华大学科学馆加固工艺实例分析[J].建筑结构,2007,37(S1):595-597. 被引量:7

引证文献4

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部