摘要
介绍了丹江口大坝加高工程左联坝段混凝土工程的施工条件及施工方案,着重介绍其混凝土供料线的技术设计及应用效果。
The construction conditions and construction schemes of the left concrete dam blocks of Danjiangkou dam heightening works are described in brief;the design of the concrete-supply line for the left dam blocks heightening works and its operation result are described in detail.
出处
《湖北水力发电》
2008年第1期20-22,共3页
Hubei Water Power
关键词
丹江口大坝加高工程
左联坝段
供料线
Danjiangkou dam heightening works
left dam blocks
concrete-supply line