分析了洞坪水电厂在电网发生全网失压事故时,实施黑启动方案恢复机组运行的有关影响因素及应注意的问题。
When the voltage of Xuan en local power grid totally breaks down,the power units of Dongping Hydropower Plant have to start by means of black start to return to normal operation,the relevant factors to black start and matters needing attention are analyzed.
出处
《湖北水力发电》
2008年第2期50-51,54,共3页
Hubei Water Power
关键词
电网
事故
水轮发电机组
黑启动
power grid
accident
hydropower unit
black start