期刊文献+

软件项目风险优化控制方法研究 被引量:3

An Approach to Optimize Software Project Risk Control
下载PDF
导出
摘要 基于软件项目风险传递算法提出了一个软件项目风险优化控制模型,设计了一种基于动态规划的软件项目风险控制离散优化算法,并通过示例确认了上述方法在解决实际问题中的效用. A model for optimizing software risk control based on risk transfer is given,and a discrete optimization algorithm of dynamic programming software risk control is proposed.An example of using above method to solve a problem is given to show its effectiveness.
出处 《鲁东大学学报(自然科学版)》 2007年第4期314-317,322,共5页 Journal of Ludong University:Natural Science Edition
关键词 软件项目 风险控制 风险管理 传递算法 software project risk control risk management transmission algorithm
  • 相关文献

参考文献8

  • 1[1]Boehm B.A Spiral Model of Software Development and Enhancement,Tutorial:Software Engineering Project Management[M].Washington:IEEE Computer Society Press,1987:28-142.
  • 2[2]Xu Ruzhi,Nie Peiyao,et al.Optimizing Software Process based on Risk Assessment and Control[C]//Proceedings of the 5th International Conference on Computer and Information Technology.Washington:IEEE Computer Society,2005:896-900.
  • 3徐如志,钱乐秋,张敬周,赵文耘.基于度量的软件项目过程优化控制研究[J].电子学报,2003,31(z1):2106-2109. 被引量:7
  • 4[4]Charette R N.Large-scale project management is risk management[J].IEEE Software,1996,13 (4):110-117.
  • 5[5]Carnegie Mellon University.Risk Management Overview,CMMI-SE/SW Version 1.1[CP/OL],http://www.sei.cmu.edu/cmmi,2002-01-11.
  • 6[6]Elaine M.Managing Risk:Method for software systems development[M].Cisco:Addison-Wesley.1998:48-126.
  • 7[7]Chang C K,Christensen M.A net practice for software project management[J].IEEE Software,1999,16(6):80-88.
  • 8[8]Jacob Sukhodolsky.Object state monitoring optimization[J].International Journal of Applied Science and Computations,1997,3 (3):239-250.

二级参考文献8

  • 1[1]C K Chang, M Christensen. A net practice for software project management[ J]. IEEE Software, 1999,16(6): 80 - 88.
  • 2[2]R N Charette. Large-scale project management is risk management[J].IEEE Software, July, 1996:110 - 117.
  • 3[3]B Kanchana, et al. Software quality enhancement through software process optimization using Taguchi methods [ A]. Proceeding of IEEE Conference on Engineering of Computer-Based Systems [ C ]. Nashville,Tennessee, March 1999.188 - 193.
  • 4[4]B Boehm. Software Engineering Economics[ M]. Prenctice Hall, 1981.
  • 5[5]Barraza, B A, Back, W E, Mata, F. Probabilistic monitoring of project performance using SS-curves[ J]. Journal of Construction Engineering & Management, 2000,126(2): 142 - 148.
  • 6[6]Jacob Sukhodlsky,W Smari. Software project control optimization[ A ].Proceeding Of the 2000 IEEE International Conference on Information Reuse and Integration[ C ]. Honolulu, Hawaii,2000.42 - 49.
  • 7[7]Pankaj Jalote. CMM in Practice:Process for Executing Software Projects at Infosys[ M]. Addison-Wesley, 2000.
  • 8[8]Xu Ru-zhi, Qian Le-qiu. CMM-based software risk control optimization[A]. Proceeding of the 2003 IEEE International Conference on Information Reuse and Integration (IRI-2003) [ C ]. Las Vegas, 2003.499 -503.

共引文献6

同被引文献12

  • 1徐如志,钱乐秋,张敬周,赵文耘.基于度量的软件项目过程优化控制研究[J].电子学报,2003,31(z1):2106-2109. 被引量:7
  • 2鄢超,薛质.软件项目的风险管理策略[J].项目管理技术,2009,0(S1):507-511. 被引量:3
  • 3陈勇强,汪智慧,高明.项目管理承包模式下激励合同的构建[J].天津大学学报(社会科学版),2006,8(4):241-244. 被引量:22
  • 4林关成.软件项目管理中的风险分析与管理[J].渭南师范学院学报,2007,22(2):59-62. 被引量:7
  • 5项目管理知识体PMBOK第三版(2004版).
  • 6Siffat Ullah Khan,Mahmood Niazi,Rashid Ahmad.Factors influencing clients in the selection of offshore software outsourcing vendors: An exploratory study using a systematic literature review[J].The Journal of Systems & Software.2010(4)
  • 7Cengiz Kahraman,Orhan Engin,?zgür Kabak,?hsan Kaya.Information systems outsourcing decisions using a group decision-making approach[J].Engineering Applications of Artificial Intelligence.2008(6)
  • 8Lisa Y. Chen,Tien-Chin Wang.Optimizing partners’ choice in IS/IT outsourcing projects: The strategic decision of fuzzy VIKOR[J].International Journal of Production Economics.2008(1)
  • 9Kweku-Muata Osei-Bryson,Ojelanki K. Ngwenyama.Managing risks in information systems outsourcing: An approach to analyzing outsourcing risks and structuring incentive contracts[J].European Journal of Operational Research.2005(1)
  • 10Vivek Choudhury,Rajiv Sabherwal.Portfolios of Control in Outsourced Software Development Projects[J].Information Systems Research.2003(3)

引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部