摘要 龙滩电站共安装9台单机容量为700MW的水轮发电机组,相比于三峡电站,龙滩电站机组具有运行水头高、水头变幅大等特点。尤其是发电机部分,单机700MW机组为全密闭循环空气冷却的运行方式,其安装难度和技术要求相对其他大型电站都有较大幅度的提高。本文结合龙滩电站首台机组定子铁芯的安装工作,对安装工艺的主要特点和出现的技术问题做了简要的分析和总结,以此为同类机组施工提供必要的参考。 In the Longtan Hydropower Station there are totally 9 generator units at a capacity of 700MW each,which are characterized by high operational water head and big change of water head,etc as comparing with the Three Gorges Hydropower Station,particularly that generators at 700MW each,which are full closed and circulated air cooling,demand high technical requirement and incur great difficult for their installation comparing with other large-scale hydropower stations.The article makes a brief analysis and summa...
出处 《水利学报》 EI CSCD 北大核心 2007年第S1期30-35,共6页 Journal of Hydraulic Engineering
关键词 龙滩电站 定子铁芯 叠装 工艺 Longtan Hydropower Station Iron core of Stator lamination Workmanship
  • 相关文献

参考文献2

  • 1GB/T 8564-2003.水轮发电机组安装技术规范[S],2003.
  • 2陈造奎.水力机组安装与检修[M]中国水利水电出版社,1998.

同被引文献3

  • 1刘文清.最新水利水电机电安装工程施工工艺与技术标准实用手册[M].合肥:安徽文化音像出版社.2006
  • 2GB/T8564—2003水轮发电机组安装技术规范[S].北京:中闰标准出版社.2004.
  • 3SD287-88水轮发电机定子现场装配工艺导则[S].北京:水利电力出版社,1988.

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部