摘要
浙北引水工程是解决浙北地区缺水问题的有效措施之一。为了对浙北引水工程的3个拟定方案——新安江方案、富春江方案和太湖-富春江方案进行选优评价,本文建立了基于资源-社会-经济-环境-工程技术模型的浙北引水工程方案选优综合评价指标体系,并采用降半梯形法确定末级指标隶属度,将层次分析法与变异系数法确定的末级指标权重进行加权求和以确定综合权重,最后采用模糊综合评价法对各方案进行综合评价,评价结果认为太湖-富春江方案的近期实施可行性较大,新安江方案近期实施难度较大,但亦有可能作为浙江省水资源远景规划的备用水源方案。
Project of water diversion to northern Zhejiang province is one of the efficient measurements to release the northern Zhejiang province from the water scarcity. To evaluate and compare the practical possibilities of three schemes of this water diversion project,Xinanjiang case,Fuchunjiang case and Taihu-Fuchunjiang case,a comprehensive evaluation index system based on resource-society-economy-environment-technique model is established.The method of analytical hierarchy process(AHP) and the method of variati...
出处
《水利学报》
EI
CSCD
北大核心
2007年第S1期251-255,共5页
Journal of Hydraulic Engineering
关键词
浙北引水工程
模糊综合评价
层次分析法
变异系数法
Project of water diversion to northern Zhejiang province
Fuzzy comprehensive evaluation
Analytical hierarchy process(AHP)
Method of variation coefficient