摘要
简要介绍了四川洪沟变电站安装静止无功补偿系统SVS的必要性。同时,对川电外送通道加装SVS的配置方案进行了粗略说明。最后,对洪沟变电站SVS系统的经济效益进行了简单计算。结果表明,洪沟变电站SVS系统具有明显的经济效益。
The necessity of installing Static Var System(SVS) in Honggou Substation of Sichuan is introduced in brief,and the installation schemes for transmission path from Sichuan to East China are presented briefly.At last,the economic benefit of the project is calculated.The result shows that the project has much more economic benefit.
出处
《四川电力技术》
2007年第S1期34-37,共4页
Sichuan Electric Power Technology