期刊文献+

CFG桩在遂渝线无砟轨道综合试验段中的应用 被引量:2

Application of CFG Pile in Ballastless Track Integrated Experimental Section of Suining-Chongqing Railway
下载PDF
导出
摘要 研究目的:通过开展CFG桩在遂渝线无砟轨道综合试验段地基处理中的应用研究,提高对CFG桩的设计与施工的认识。研究结论:CFG桩复合地基设计时,桩体强度可采用5 MPa;CFG桩复合地基承载力一般在220-250 kPa,满足设计要求;路堤竣工后1个月CFG桩复合地基沉降已趋于稳定,路堤竣工后CFG桩复合地基沉降量较小,一般在10~25mm。 Research purposes:The research is done on the application of CFG pile in ballastless track integrated experimental section of Suining-Chongqing Railway for the purpose of learning more about CFG pile design and design. Research results:The strength of pile body can be designed to 5 MPa for CFG pile composite foundation and the beating capacity of CFG pile composite foundation is between 220 and 250 kPa in general,which can satisfy the design requirement.The one-month s post-construction subsidence of CFG pi...
出处 《铁道工程学报》 EI 北大核心 2007年第S1期113-116,共4页 Journal of Railway Engineering Society
关键词 遂渝线 无砟轨道 CFG桩复合地基 设计 Suining-Chongqing Railway ballstless track CFG pile composite foundation design
  • 相关文献

同被引文献13

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部