本文以某1000MW电厂塔式炉基础为例,通过计算比较,对锅炉基础结构布置进行了优化,获得了桩筏基础设计的一些优化结论,并希望籍此对类似基础设计有借鉴作用.
Taking the foundation of a tower furnace of a 1 000 MW power plant for example,through calculation and comparison the layout of foundation of furnace are optimized.Some optimum conclusions of piled raft foundation design are obtained so as to offer reference in design of similar foundations.
出处
《武汉大学学报(工学版)》
CAS
CSCD
北大核心
2007年第S1期238-241,共4页
Engineering Journal of Wuhan University