4[4]R.L.Church and C.S.ReVelle The maximal covering location prob-lem[J].Papers of the Regional Science Association,1974:32,101-118.
5[5]Sherali,H.D.,Subram8nian,S.Opportunity Cost-based Models for Tramc Incident Response Problem[J].Journal of Transporta-tion Engineering,1999,125(3):176-185.
6[7]G Barbamsoglu,Y Arda.A Two-stage Stochastic Programming Fmmework for Transportation Planning in Disaster Response[J].Journal of Opemtional Research Society,2004,(55):43-53.
7[8]G zhu,J F Bard,G Yu.Dismption management for resource-constrained pmject scheduling[J].Journal of the Operational Re-search Society,2005,56:365-381.