期刊文献+

大型地下洞室施工顺序的数值方法优化 被引量:5

Optimization of Numerical Method for Excavating Sequence of Large Underground Cavern
下载PDF
导出
摘要 结合某工程大断面地下洞室建设中围岩稳定问题,以开挖过程中对周围岩体的扰动破坏面积最小、产生的最大位移最小作为优化准则,采用数值方法对同一断面内两种不同的开挖顺序进行了模拟计算,分析比较,得出了最优的施工开挖顺序,为设计和施工提供了较为可靠的依据。 In combination with the stabilization problem of the surrounding rock in a large underground cavern project and in order to get proper excavating sequence, two planar models are founded and calculated by FLAC3D. The optimal excavating sequence is determined by the criteria of the minimum plastic area of plastic zone and minimum maximum displacement. The optimal excavating sequence gotten according to these two criteria could serve as reference in the design and construction.
出处 《地下空间与工程学报》 CSCD 2007年第z2期1459-1463,共5页 Chinese Journal of Underground Space and Engineering
关键词 地下洞室 施工 数值模拟 优化 underground cavern construction numerical simulation optimization
  • 相关文献

参考文献1

  • 1[4]M.Caia,P.K.Kaisera,H.Moriokab,M.Minamib,T.Maejimab,Y.Tasakac,H.Kurosec.FLAC/PFC coupled numerical simulation of AE in large-scale underground excavations[J].International Journal of Rock Mechanics & Mining Sciences.2006,3(9)

同被引文献62

引证文献5

二级引证文献32

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部