摘要
无锡投运了江苏省内第一座数字化变电站,在自动化的调试的过程中积累了一定的经验。介绍了数字化变电站自动化系统的结构,简单说明了IEC61850协议,阐明了无锡圆石变电站的数字化原理,设计了变电站低压线路和电容器的遥测精度调试方案。
The first digital substation in Jiangsu province is running in Wuxi,and we accumulate much experience in automatization debugging.The configuration of digital substation is introduced,including IEC61850 protocol.The digitization principle of Yuanshi substation is illustrated.The low-voltage line of substation and the debugging scheme of remote measurement precision are designed.
出处
《江苏电机工程》
2007年第z1期20-22,共3页
Jiangsu Electrical Engineering