摘要 针对后张法预应力混凝土构件中由锚具变形、预应力钢束回缩和接缝压缩等引起的预应力损失计算方法适用范围较窄和误差较大的缺点,基于变形协调条件,通过分段近似计算方法,建立了锚具变形、预应力钢束回缩和接缝压缩等引起的预应力损失计算公式,并与实际预应力混凝土T形截面简支梁的计算结果进行了比较。结果表明,该公式具有计算精度高、适用范围广的优点,特别适用于预应力孔道线形复杂的构件,既易于编制计算程序又可简单地在Excel上完成计算。 According to the post-tensioning method in prestressed concrete members,the calculation method of prestress losses caused by the deformation anchorage device,slip of tendon and joint compression was big in the error and narrow in the scope of application.Based on the condition of deformation compatibility,the computing formula of prestress losses caused by deformation of anchorage device,slip of tendon and joint compression was established by using calculation method of piecewise approximation,meanwhile,the calculation result was compared with the simple T-beam of prestressed concrete.The result shows that the formula is high in precision and wide in applicability.It is apt to work out calculation procedure and can complete the calculation at Excel simply,especially it adapts the member of which its prestressed duct has complex alignment.
作者 魏炜 董丁明
出处 《建筑科学与工程学报》 CAS 2007年第4期86-90,共5页 Journal of Architecture and Civil Engineering
关键词 预应力损失 后张法 反向摩擦 锚具变形 影响长度 效应 prestress loss post-tensioning method reverse friction deformation of anchorage device influence length effect
  • 相关文献

参考文献5

二级参考文献49

共引文献127

同被引文献89

引证文献10

二级引证文献48

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部