摘要
江西省丰城市黄金水库大坝采用液压抓斗法造塑性砼防渗墙进行防渗处理,有效地控制了坝身、坝基渗漏,防渗效果明显.文章对该水库塑性砼防渗墙的施工工艺及质量控制作了介绍.
The plastic concrete cutoff wall is applied to treat the seepage of the dam of Huangjing Reservoir in Fengcheng city of Jiangxi province by the liquid grab method in order to control the seepage of its dam body and dam foundation.The treatment effect is good.The construction technology and quality control of the plastic concrete cutoff wall are introduced.
出处
《江西水利科技》
2007年第4期216-218,239,共4页
Jiangxi Hydraulic Science & Technology
关键词
塑性砼
防渗墙
施工工艺
质量控制
Plastic conctete
Cutoff wall
Construction technology
Quality control