摘要
中关村科技园区是北京市重点工程。软件园区是科技园建设总体规划中的重要组成部分。该工程中有4条外部市政道路工程,6条内部市政道路工程,其中有11条圆曲线,道路交叉比较繁杂,文中详细介绍了道路工程的施工测量放线过程,以及施工测量中一些常用的校核方法和一般圆曲线计算。
Zhongguan village technology garden is a key project in Beijing.The Software garden is an important part of the whole projects. There are 4 outsider municipal urban road engineering and 6 inner municipal urban road engineering in the construction of Software garden.So it is a complicated project.This paper introduce the procession of skating out in road construction,also the usual method of checking and the general circular curve calculation in construction survey.
出处
《现代测绘》
2007年第4期24-25,共2页
Modern Surveying and Mapping
关键词
施工测量
校核
圆曲线
Construction survey
Checking
Circular curve