摘要
以湿法石灰石-石膏烟气脱硫系统在电厂的使用实绩为例,与大家探讨脱硫控制方案优化、进一步提高系统可靠性、降低工程成本的方法。
Taking the hydro-limestone-gypsum flue gas desulfurization system in Power Plant as an example,the desulfurization control method is discussed in this article not only to improve it but to make it more reliable and decrease the project cost.
出处
《山东电力高等专科学校学报》
2007年第2期36-39,共4页
Journal of Shandong Electric Power College