摘要
介绍了仪征化纤股份有限公司涤纶三厂9万t长丝车间的结构设计。对地基处理方案的选择进行了探讨,并详细地阐述了此工程上部结构的特点。
The paper introduces the structure design of ninety thousand ton continuous filament workship for The Third Polyester Plant of Yizheng Chemical Fibre Co.,Ltd.It is chiefly inquired into the selection of ground treatment method,and is given a minute introduction to the characteristics of above ground structure for this project.
出处
《工业建筑》
CSCD
北大核心
2007年第z1期345-346,355,共3页
Industrial Construction
关键词
长丝车间
地基处理
预应力混凝土结构
轻钢结构
continuous filament workship ground treatment prestressed concrete structure light-weight steel structure