摘要
通过500t水塔工程施工的介绍,阐述了脚手架翻模施工技术。
It is introduced the construction plan of a 500t water tower,and it is described the construction technology of turnover formwork of scaffold.
出处
《工业建筑》
CSCD
北大核心
2007年第z1期1048-1050,共3页
Industrial Construction
关键词
水塔
脚手架
翻模施工
water tower caffold construction of turnover formwork