摘要 三峡工程规模巨大 ,技术复杂 ,到 2 0 0 1年三峡工程建设已在大江截流和混凝土防渗墙施工技术、大坝电站高强度混凝土施工、永久船闸高边坡施工技术、电站大型钢衬钢筋混凝土压力管道和蜗壳保温保压技术。 The magnificent Three Gorges project involves numerous technical issues. By 2001, solutions have been made for the key technical problems associated with the river closure and diversion, construction of concrete cut-off walls, concrete construction at high placement rates, high slope construction of the shiplock, major composite steel reinforced concrete penstocks, spiral cases covered with concrete with desirable resistance to water temperatures and pressures, and application of asphalt concrete core to e...
作者 张超然 ZHANG Chao-ran (China Three Gorges Project Corporation; Yichang 443002; China);
出处 《中国三峡建设》 2001年第7期-,共5页 China Three Gorges Construction
关键词 大江截流 防渗墙 高强度混凝土施工 高边坡 钢衬钢筋混凝土 蜗壳保温保压 沥青混凝土心墙 river closure cut-off wall concrete construction at high placement rate high slope composite reinforced concrete penstock spiral case with desirable resistance to water temperature and pressure asphalt concrete core wall.
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部