摘要
论述了切向冻胀应力引起船台桩基础"冻拔"质量问题的作用机理;研究制定的"冻拔"质量问题的工程防治措施应用效果的实验监测。
This paper analyzes the function process of frost heaving pressure which causes the quality problem of "upward freezing pulling" about shipway pile foundation,and research to conduct experiment survey on application effect of the developed engineering prevention measures.
出处
《长春工程学院学报(自然科学版)》
2008年第1期4-7,共4页
Journal of Changchun Institute of Technology:Natural Sciences Edition
基金
建设部基金资助"湖岸构筑物冻害分析及处理"(06-K1-10)
关键词
船台桩基础
切向冻胀应力
“冻拔”质量问题
工程防治措施
监测
shipway piles foundation
frost heaving pressure
the quality problem of "upward freezing pulling"
engineering prevention measures
survey