结合国华锦界能源有限责任公司600 MW机组脱硫工程,对脱硫系统是否设置再热器(GGH)的经济性进行了分析论证,并对大气污染物的环境影响进行了计算分析。
Combined with the desulfurization project in Guohua Jinjie Power Resources Corp. Ltd with the capacity of 600 MW the analysis and discussion are made on whether setting GGH in FGD system. Calculation and analysis are conducted on the effect of atmospheric pollutants upon environment.
出处
《陕西电力》
2006年第7期47-48,共2页
Shanxi Electric Power