期刊文献+

乐滩水库引水灌区工程移民生产安置浅析

Production resettlement for inhabitants in Letan reservoir irrigation area
下载PDF
导出
摘要 在调查乐滩水库引水灌区移民数量及其生产生活水平和拆迁面积的基础上,采用系统分析方法进行移民环境容量分析,确定移民安置区可容纳的移民人数。根据灌区实际情况,提出了生产安置标准和生产开发项目,确保移民生活水平达到规划目标值,与所在地区同步发展。 Based on an investigation of the population,production and living standard of inhabitants to be resettled,the area of pulling down and rebuilding residence as a result of construction of Letan reservoir irrigation project,resettlement environment capacity was analyzed by systems analysis method,the population of inhabitants which the resettlement area can accept was determined.According to the actual conditions of irrigation area,the production resettlement standard and production development project are put forward aiming to ensure the living standard of the resettled inhabitants is up to the planned objective and the resettled zone will develop synchronously with the site.
作者 陆山
出处 《广西水利水电》 2006年第4期92-93,100,共3页 Guangxi Water Resources & Hydropower Engineering
关键词 移民安置 生产安置 环境容量 乐滩水库灌区 Inhabitant resettlement production resettlement environment capacity Letan reservoir irrigation area
  • 相关文献

参考文献2

  • 1[1]广西水利电力勘测设计研究院.广西桂中治旱乐滩水库引水灌区工程可行性研究报告[R].南宁:广西水利电力勘测设计研究院,2006.
  • 2施国庆 荀厚平 等.水库移民系统规划理论与应用[M].南京:河海大学出版社,1996.101-105.

共引文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部