摘要
在调查乐滩水库引水灌区移民数量及其生产生活水平和拆迁面积的基础上,采用系统分析方法进行移民环境容量分析,确定移民安置区可容纳的移民人数。根据灌区实际情况,提出了生产安置标准和生产开发项目,确保移民生活水平达到规划目标值,与所在地区同步发展。
Based on an investigation of the population,production and living standard of inhabitants to be resettled,the area of pulling down and rebuilding residence as a result of construction of Letan reservoir irrigation project,resettlement environment capacity was analyzed by systems analysis method,the population of inhabitants which the resettlement area can accept was determined.According to the actual conditions of irrigation area,the production resettlement standard and production development project are put forward aiming to ensure the living standard of the resettled inhabitants is up to the planned objective and the resettled zone will develop synchronously with the site.
出处
《广西水利水电》
2006年第4期92-93,100,共3页
Guangxi Water Resources & Hydropower Engineering
关键词
移民安置
生产安置
环境容量
乐滩水库灌区
Inhabitant resettlement
production resettlement
environment capacity
Letan reservoir irrigation area