2[2]Cheng,Y..Knowlede-based airport gate assignment system integrated with mathematical programming[J].Computers and Industfial Engineering,1997,32(4):837-852.
7[7]Yan Shangyao,Huo Cheunming.Optimization of Muhiple Objective Gate Assignments[J].Transportation Research Part A:Policyand Practice,2001,35(5):413-432.
二级参考文献21
1Gosling G D. Design of an expert system for aircraft gate assignment[J]. Transportation Research A,1990,24(1):59~69.
2Su Y Y,Srihari K. A knowledge-based aircraft-gate assignment advisor[J]. Computers and Industrial Engineering, 1993, 25(2):123~126.
3Babic O, Teodorovic D, Tosic V. Aircraft stand assignment to minimize walking[J]. Journal of Transportation Engineering,1984,110(1):55~66.
4Bihr R A. A conceptual solution to the aircraft gate assignment problem using 0-1 linear programming[J]. Computers and industry Engineering, 1990,19(3):280~284.
5Bolat A.Procedures for providing robust gate assign- ments for arriving aircrafts [J]. European Journal of Operational Research, 2000,120(1):63~80.
6Arkin E M, Silverberg E B. Scheduling jobs with fixed start and end times[J]. Discrete Applied Mathematics, 1987,18:1~8.
7Gupta U I, Lee D T. Leung J Y T. An optimal solution for the channel-assignment problem[J]. IEEE Transactions Computer, 1979, C-28:807~810.
8Fischettim, Martello M S, Toth P. Approximation algorithms for fixed job schedule problems[J]. Operational Research, 1992,40:96~108.
9李文权.[D].成都:西南交通大学,1996.
10Lyons P J.Applying Expert System Technology to Business [M].Wadsworth, Inc., 1994.