5[5]UZSOY R,WANG C S.Performance of decomposition Drocedures for job shop scheduling problems with bottleneck machines[J].Int.J.of Production Research,2000,38(6):1271-1286.
6[6]MOSS H K,Yu WB.Toward the estimation of bottleneck shiltness in a manufacturing operation[J].Production and Inventory Management Journal,Second Quarter,1999:53-58.
7[7]NAKATA T,MATSUI K,MIYAKE Y.et a1.Dynamic bottleneck control in wide variety production factory[J].IIE Transactions on Semiconductor Manufacturing,1999,12(3):273-279.
8[8]Hoda EIMaraghy.A Genetic Algorithm Based Approach for Scheduling of Dual-Resource Constrained Manufacturing Systems[J].Annals ofthe CIRP,1999,48(1).
5G. Salvendy. Handbook of Industrial Engineering. New York: John Wiley&Sons., Inc. 2001,3rd. Ed. 1-18
6D Liu, L Zheng, Z Li, et al. Agile manufacturing and supply system oriented viriual enterprise. Computer - Aided Production Engineering.Professional Engineering Publishing. Suffolk, UK. 2001. 435 -438
7张继焦.价值链管理[M].北京:中国物价出版社,2001..
8Hammer, M. and Champy, J. (1993), Reengineering the corporation, HarperCollins, New York, NY.
9Hammer, M. and Stanton, S.A. (1995), The Reengineering Revolrtion, Hammer and Co. , New York,NY.
10Mohsen Attaran, Why does reengingeering fail? A practical guide for successful implementation. Journal of management development, Vol 19 No. 9. 2000. pp. 794 - 801.