1刘福国(Liu Fuguo).邹县电厂#2锅炉运行特性优化试验报告(Report of operation performance optimization for unit 2 in Zouxian Power Plant).2001-6055-06[R].济南:山东电力研究院(Jinan:Shandong Electric Power Research Institute),2001..
2.(GB 10184-88).(Performance test code for utility boiler)电站锅炉性能试验规程[S].北京:国家技术监督局(Beijing:National technique Super-vising Bureau),1989,33-37..