摘要
论述了三峡水电站机组定子和转子安装工艺流程,定子铁芯分段叠压和转子磁极安装的主要技术,以及机组安装调试过程中发现的有关问题及处理方法。
The installation process of stator and rotor of the Three Gorges hydro-generating sets,the key technologies of sectionally pile-up compaction of the stator and the assemblage of magnetic poles of the rotor are described;besides,the solutions for problems occurred!in installating and debugging works are described.
出处
《湖北水力发电》
2008年第4期62-66,共5页
Hubei Water Power
关键词
三峡水电站
机组
安装技术
工艺流程
处理方法
Three Gorges Hydropower Station
hydro-generating set
installation technology
technological process
treatment measures