摘要 以朱庄煤矿Ⅲ628工作面底板灰岩含水层改为隔水层为例,介绍了防治底板承压水注浆加固的钻探和注浆工艺。钻探施工,注浆加固,将6煤底板以下52~58m改造为隔水层,钻孔以斜孔为主,使钻孔揭露的含水层段尽量长,以增加注浆量,注浆工程采用地面注浆,注浆采取高标号水泥,高压稀浆,连续注浆方式进行的,提高浆液扩散半径,增加注浆量都有积极的作用。注浆后进行了二次电法检查,透孔注水检查注浆效果以及取芯验证注浆质量等。 Taking a limestone water bearing layer floor reformed to a water isolated layer floor of Ⅲ628 coal mining face in Zhuzhuang Mine as an example, the paper introduced the drilling and grouting technology to grouting and reinforcing the floor for prevention and control the pressurized water in the face floor.The drilling operation and the grouting reinforcement were to reform the water bearing layer to a water isolated layer which was 52 to 58 m below the No.6 seam floor.The drilling boreholes were mainly incl...
作者 王永龙
出处 《煤炭科学技术》 CAS 北大核心 2008年第3期96-98,共3页 Coal Science and Technology
关键词 钻探施工 注浆加固 底板含水层改造 drilling construction grouting reinforcement reform of water bearing layer floor
  • 相关文献

同被引文献47

引证文献4

二级引证文献24

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部