深厚表土层井筒破坏预防性治理技术 被引量:7

Preventive control technology for mine shaft damage in deep overburden
下载PDF
导出
摘要 介绍了济宁三号煤矿副井预防性治理过程中的经验,治理方案采用破壁水泥注浆和开卸压槽及注浆段井圈加固方法进行。通过对治理过程中井壁变形监测数据进行分析,指出注浆过程分为注浆稳定阶段和波动阶段。注浆稳定阶段应充分降低土层含水量和孔隙率;注浆波动阶段注浆应循序渐进进行,逐渐巩固初期注浆的效果。当回浆压力特别大时,应根据井壁动态监测数据及时调整注浆压力和注浆部位。针对井壁应变的安全监测报警值问题,提出采用控制应变增长速率作为报警限值的概念。 The paper introduced the experiences of the preventive control for the mine auxiliary shaft in Jining No.3 Mine. The preventive control plan included the cement grouting on broken lining of the mine shaft, the pressure releasing slot and the reinforced method for grouting section of the mine shaft lining. After the analysis on the deformation monitoring and measuring data during the preventive control period, the paper pointed out that the grouting process could be divided to a grouting stable stage and a g...
出处 《煤炭科学技术》 CAS 北大核心 2008年第4期16-19,共4页 Coal Science and Technology
关键词 井壁 预防性治理 变形监测 mine shaft lining preventive control deformation monitoring and measuring
  • 相关文献

参考文献8

二级参考文献48

共引文献106

同被引文献72

引证文献7

二级引证文献45

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部