期刊文献+

采空(人为坑洞)研究 被引量:6

RESEARCH ON THE GOB(MAN-MADE CAVITY)
下载PDF
导出
摘要 采空区不良地质问题影响铁路工程地质选线和运营安全,并且规模越来越大。通过几十年来铁路工程积累的经验,提出不同等级的铁路适应地表和岩层变形的能力不一样,塌陷角的选择和保护煤柱的宽度也不同,高速铁路应该留设更宽的安全煤柱。 The unfavorable geological condition threatened the railway safety and rail track selection and the size of gob was more and more bigger.Through many years of experience in railway engineering,it is realized that the adaptability for ground surface and terrane deformation was different for different grade railway.Be- sides,the selection of collapse angle and the width of protection coal wedge were also different.The broader coaX wedge should be retained for high-speed railway.
作者 赵建峰
出处 《铁道工程学报》 EI 北大核心 2005年第z1期364-368,共5页 Journal of Railway Engineering Society
关键词 采空区 工程地质选线 地表变形 gob rail track selection ground surface deformation
  • 相关文献

同被引文献33

  • 1潘瑞林.采空区物探方法新探[J].铁道勘察,2010,36(6):23-26. 被引量:9
  • 2魏安辉,曾德礼.路基采空区注浆效果检查方法初探[J].路基工程,2006(4):91-93. 被引量:2
  • 3范春林.包西铁路通道冒天山越岭地质选线[J].山西建筑,2007,33(1):325-327. 被引量:1
  • 4铁道第一勘察设计院.铁路工程地质实例[M].北京:中国铁道出版社,2002.
  • 5陕西省地质矿产局.陕西省区域地质志[M].北京:地质出版社,1989..
  • 6国家煤炭工业局.建筑物、水体、铁路及主要井巷煤柱留设与压煤开采规程[M].北京:煤炭工业出版社,2000..
  • 7铁道第一勘察设计院.铁路工程地质手册[M].北京:中国铁道出版社,1999.
  • 8铁道第一勘察设计院.包西铁路通道大保当至张桥段初步设计煤矿(窑)采空专题研究报告[R].西安,2007.
  • 9铁道第一勘察设计院.铁路工程地质手册[M].北京:中国铁道出版社,1998.
  • 10TBl0027-2001铁路工程不良地质勘察规程[S].

引证文献6

二级引证文献29

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部