北京科技大学高层学生公寓楼地基的CFG桩加固

STABILIZATION FOUNDATION OF THE STUDENTS′ TALL APARTMENTS FOR BEIJING UNIVERSITY OF SCIENCE AND TECHNOLOGY USING CFG PILE
下载PDF
导出
摘要 北京科技大学学生公寓一期、二期、三期共八个楼,建筑物地下二层,地上10~16层。针对建筑物基础下为粘性土的特点,考虑安全、经济、施工周期等因素,经科学论证,最终采用CFG桩复合地基地基加固方案。实践证明该方案是经济、有效的,加固后的复合地基既满足了地基承载力的要求,也有效的控制建筑物的沉降,同时大大的缩短了工期。 The scheme of CFG pile composite foundation was finally selected for the students′ apartments in Beijing University of Science and Technology according to the characteristics of these buildings’ foundations,and taking account of the factors such as safety,economy and construction period etc.It has been proved by practice that the scheme is economic and effective.The strengthened composite foundation can not only meet the requirements of foundation bearing capacity,but also control effectively the even and differential settlements.
作者 刘伟 洪福亮
出处 《工业建筑》 CSCD 北大核心 2005年第z1期634-636,共3页 Industrial Construction
关键词 建筑物 地基 CFG桩 承载力 沉降 building foundation CFG pile bearing capacity settlement
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部