摘要
介绍了湖南省政府主办公楼主桁架张拉索的施工过程,实际施工中张拉内力及位移的计算控制,以供广大读者参考。
It is introduced that the construction process,the internal forces of tension during actual construction,and the control of displacements of the tension cables of main truss of the main office building for Hunan Provincial Government.Which provides a reference for readers.
出处
《工业建筑》
CSCD
北大核心
2005年第z1期754-757,共4页
Industrial Construction
关键词
拉索施工
变形测试
质量控制
内力与位移
construction of cables deformation test quality control internal force and displacement