摘要 采用现场观测及计算机数值模拟计算方法,研究综放工作面端面顶煤冒顶机理,得出后端面顶煤冒顶的主要影响因素是端面距大小、片帮范围和支架的初撑力,控制端面煤壁片帮是控制顶煤冒顶的有效措施。现场应用表明,在综放面向端面煤体打木锚杆是控制煤壁片帮的有效手段,通过实施该措施,端面煤岩体平均冒落高度由3.5 m下降到0.8 m,取得了显著的经济技术效益。 With the site observation and the computer numerical simulation calculation method,the paper studied the top coal falling mechanism at the front of the fully mechanized longwall top coal caving mining face.The main affected factors of the top coal failing at the rear of the front face obtained were the distance of the front face,coal wall spalling area and the initial support force of the hydraulic powered support.The coal wall spalling control is the effective measure to control the top coal falling.The si...
出处 《煤炭科学技术》 CAS 北大核心 2008年第2期9-11,共3页 Coal Science and Technology
关键词 综放开采 顶煤稳定性 数值模拟 端面距 fully mechanized longwall top coal caving mining stability of top coal numerical simulation face front distance
  • 相关文献

参考文献2

  • 1[1]何富连,钱鸣高,刘长友.高产高效工作面支架-围岩保障系统[M].徐州:中国矿业大学出版社.1997.
  • 2[2]Christoph Dauber.Working with long faces[J].World Coal,2003(7).

同被引文献8

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部