摘要 根据景德镇-黄山高速公路某隧道现场工程地质条件和隧道结构设计参数,采用有限差分法对喷射500mm普通混凝土支护和喷射200mm厚聚丙烯纤维混凝土支护两种支护结构,进行了施工过程的数值模拟分析。从围岩的应力、位移和塑性区分布3个方面对隧道围岩的稳定性进行了分析。模拟计算结果表明,采用喷射200mm厚聚丙烯纤维混凝土支护结构的隧道围岩能够处于稳定状态。 In combination with the real geological engineering conditions and the design parameters of the tunnel layout, numerical analysis is performed to analyze the rock mass stability for two different supporting structures, the ordinary concrete lining with thickness of 500 mm and the wet-sprayed polypropylene fiber reinforced concrete lining with the thickness of 200 mm respectively. The tunnel rock mass stability is analyzed for the stress, displacement and plastic zone distribution. The numerical simulation s...
出处 《岩土力学》 EI CAS CSCD 北大核心 2005年第S1期168-170,共3页 Rock and Soil Mechanics
关键词 隧道围岩 有限差分法 支护结构 稳定性 数值模拟 tunnel rock mass finite difference method supporting structure stability numerical simulation
  • 相关文献

同被引文献43

引证文献8

二级引证文献59

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部